Sigit, A. (2019) “OPTIMALISASI BIAYA DAN WAKTU PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN WAKTU KERJA (LEMBUR) DAN SISTEM KERJA SHIFT”, Teknisia, 23(2), pp. 505–515. Available at: https://jurnal.uii.ac.id/teknisia/article/view/12573 (Accessed: 12 May 2024).