Sigit, Adityawan. “OPTIMALISASI BIAYA DAN WAKTU PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN WAKTU KERJA (LEMBUR) DAN SISTEM KERJA SHIFT”. Teknisia 23, no. 2 (May 30, 2019): 505–515. Accessed May 12, 2024. https://jurnal.uii.ac.id/teknisia/article/view/12573.